JMD Engineering News
Contact Us
Latest News & Project Updates
SARACEN | CAROSUE DAM CIL CIRCUIT EXPANSION
CLIENT: Saracen PROJECT SUMMARY The scope for this project included the engineering design and drafting to extend the existing Saracen CIL circuit to include an additional 2 x adsorption tanks (TK08 & TK09) The design required a new platform and steelwork to...
PACER | OM MANGANESE | 150 TPH DMS PLANT
CLIENT: PACER / OM Manganese PROJECT SUMMARY Project Location: Northern Territory Date Completed: OM Manganese, based in the Northern Territory, established that they has recoverable Manganese in their coarse rejects stockpile. They determined to recover this via a...
STRIKER | WETAR COPPER – RADIAL STACKER
CLIENT: Striker Australia PROJECT SUMMARY Project Location: Wetar Island – Republic of Indonesia Date Completed: 2016 Striker Australia designed a self-levelling towable radial heap leach stacker with follower feed conveyor. JMD Engineering were engaged by Striker to...
SOUTH32 | OBC BRIDGE INSPECTION
CLIENT: South32 PROJECT SUMMARY Project Location: Worsley Alumina Refinery As part of scheduled inspection regime, JMD were engaged by South32 to conduct steel and concrete structural inspections of twelve (12) Overland Conveyor bridges. The project scope included the...
GOLD FIELDS LTD. | DARLOT COMPRESSED AIR STUDY
CLIENT: Gold Fields Ltd. PROJECT SUMMARY Project Location: Darlot Gold Mine Date Completed: JMD Engineering were engaged by Gold Fields Darlot to conduct an inspection of the compressed air system operating at their underground gold mine. JMD was to determine the root...
ILUKA | CARBON PRODUCT HANDLING
PROJECT SUMMARY Project Location: Iluka, North Capel Iluka required a new Carbon Product Storage Facility which consisted of bulk earthworks, new and realigned roads, storage shed, truck loading bay and concrete retaining. JMD Engineering were engaged by Iluka to...
TALISON LITHIUM | VEHICLE WASH DOWN BAY CONCRETE DESIGN
CLIENT: Talison Lithium PROJECT SUMMARY Project Location: Talison Greenbushes Mine Site Date Completed: 2016 Talison Lithium required a new wash down facility for light vehicles at their Greenbushes Mine Site. JMD were engaged to provide engineering design for a new...
UGL | ALCOA PINJARRA POTABLE WATER
Client: UGL PROJECT SUMMARY Alcoa required redesign of the existing B42 potable water network consisting multiple safety showers, process equipment, high pressure water outlets, and drinking fountains within and around the building. Over time the existing network had...
GOLD FIELDS LTD. | GOLDFIELDS AGNEW WATER DISTRIBUTION
CLIENT: Gold Fields Ltd. PROJECT SUMMARY Project Location – Agnew Gold Mine Date Completed – 2015 JMD Engineering were engaged by Gold Fields Agnew to undertake water and tailing pump and piping calculations for the Agnew/ Lawlers system, and to identify preferred...
CBH | 2 WAY TRIPPER
CLIENT: CBH PROJECT SUMMARY Project Location: York, WA JMD were engaged by CBH Group to Engineer, Design, Draft, Fabricate and construct a 2 way conveyor tripper for a grain storage facility in York, WA. PROJECT ACHIEVEMENTS JMD provided the following; Preliminary...
GRIFFIN COAL | IT38 CAT LIFTING ATTACHMENT
CLIENT: Griffin Coal PROJECT SUMMARY Project Location: Muja Workshop Date Completed: 2017 Griffin Coal had an existing Lifting attachment which had been tagged out of service due to damage to the end of the lift plate. JMD provided a proposal for engineering design,...
ON SITE | 3D SCANNING FOR A CLIENT
Snr Design Draftsperson Daniel Augustine captured this on site image.
ILUKA | 3D LASER SCANNING OF CONCRETE
CLIENT Iluka PROJECT SUMMARY Project Location: Iluka North Capel Iluka required as built survey information for a recently built large (4000m2) concrete storage slab used for stockpiling of product. The survey information would provide information for drainage...
SOUTH 32 | C410001 AND C410006 BELT CHANGE STANDS
CLIENT South32 PROJECT SUMMARY Project Location: Boddington WA South32 is using their existing belt reeler to change out the conveyor belt on several conveyors. South 32 engaged JMD Engineering for the design, engineering and drafting for a removable support stand to...
ILUKA | CARBON PRODUCT HANDLING FACILITY
Client: Iluka Project Location: North Capel Project summary Iluka required a new Carbon Product Handling Facility which consisted of a product transfer conveyor, storage bins and support structure and material load out system. We were engaged to provide the...
TALISON | RAW WATER TREATMENT PLANT
Project Location: Talison Greenbushes Mine Site Project summary Talison Lithium was expanding its Greenbushes processing plants to increase production capabilities. Part of the expansion involved the design and construction of an extensive new Water...
UTEC | PALACE HOTEL 3D LASER SCAN FEATURE SURVEY
CLIENT: UTEC PROJECT SUMMARY Project Location: Palace Hotel Our client required complete feature survey of all internal structure, piping and fittings to provide as built information for major redevelopment of the historic Palace Hotel located on St Georges Tce, Perth...