CLIENT: Griffin Coal
PROJECT SUMMARY
Project Location: Muja Workshop Date Completed: 2017
Griffin Coal had an existing Lifting attachment which had been tagged out of service due to damage to the end of the lift plate. JMD provided a proposal for engineering design, drafting and verification to provide a suitable repair solution, fabrication of the new support pedestal and proof of load testing.
PROJECT ACHIEVEMENTS
JMD provided the client with modification drawing and engineering verification, supplied materials for the job, carried out repairs and modifications to the end lift plate, fabricated the new support pedestal, carried out surface treatment to the modified area and provided proof of load testing and certification.